Windship Technology has been awarded £4m as part of a consortium in the latest round of the UK’s Clean Maritime Demonstration Competition (CMDC). The project is a demonstration of a symbiotic wind propulsion and carbon capture system, aimed at making a zero-emissions shipping industry a reality.
This project will install a Windship Technology 36m tri-foiled rig on a 15,000DWT bulker alongside carbon capture technology being demonstrated by Leilac.
The Windship Technology project is part of the Clean Maritime Demonstration Competition Round 3 (CMDC3), which was announced in September 2022, funded by the
The CMDC3 is part of the UK Shipping Office for Reducing Emission’s (UK SHORE) flagship multi-year CMDC programme. In March 2022, the Department announced the biggest government investment ever in our UK commercial maritime sector, allocating £206m to UK SHORE, a new division within the Department for Transport focused on decarbonising the maritime sector. UK SHORE is delivering a suite of interventions throughout 2022-2025 aimed at accelerating the design, manufacture and operation of UK-made clean maritime technologies and unlocking an industry-led transition to Net Zero.
.
Share this Post