NTG trebles capacity with factory move

NTG Precision Engineering has marked its move to a new purpose-built facility with a series of production investments to further increase its capabilities and capacity.

Having run a dual production schedule while it transferred its machinery and team from its previous premises to ensure minimal disruption to customer projects, the new 45,000 sq ft facility in North East England is now fully operational.

Alongside its existing extensive precision engineering technology, NTG is adding to its capabilities with the addition of a Mazak i800 simultaneous 5-axis machining centre, which will be followed shortly by the installation of a Matsuura H.Plus-405 multi-pallet horizontal machining centre and larger turning capacity with the addition of a Doosan 700LM II Turning centre.

This equipment will be used in the manufacture of metal components for a range of industries including automotive, food production, automation and energy generation.

Three times the size of its former base, the new facility, in 8th Avenue, Team Valley, Gateshead, will enable NTG to increase its presence in key markets.

The building also reflects NTG’s commitment to sustainability and is part-powered by Solar PV and includes electric vehicle charging points and air source heating.

Significantly, it gives NTG more space to grow over the next five to ten years, allowing the business to be more agile and respond to commercial opportunities.

www.ntg-ltd.co.uk

Share this Post